Service Charge | $17.50 | Monthly |
Energy Charge | $0.08628 | All kWh |
The residential electric rate is available to single phase residential customers that are served through one meter at a voltage of 120/240 volts. Each apartment or dwelling unit shall be considered a single private residence.
Service Charge | $8.10 | Monthly |
Energy Charge | $0.06053 | All kWh |
A dual fuel system uses two independent heating systems to heat your home. BPU dual fuel customers use electricity as the primary source of heat. Propane, fuel oil, or natural gas can be used as the back-up heat source. The back-up heat source must be automatic and of adequate size to heat your home during peak interruptions. For example, an electric heat source, such as a plenum heater, with fuel oil, propane, natural gas or electric storage heat as the back-up heating system would qualify.
This program is available to customers who already have an electric service. This rate is interruptible up to 400 hours per season and will be remotely controlled by BPU to prevent excessive peak usage. The space heating load will be separately metered and may be interruptible at any time. This type of service is single phase or three phase, 60 hertz, at available secondary voltage.
Service Charge | $8.10 | Monthly |
Energy Charge | $0.06051 | All kWh |
This program is available to customers receiving electric service along with another electric rate schedule. This rate is for interruptible service to energy loads, which are remotely controlled by BPU. This space heating load will be separately metered. Service under this schedule will be available for approximately eight (8) hours per day, normally 11:00 p.m. to 7:00 a.m. or as established by BPU. This type of service is single phase or three phase, 60 hertz, at available secondary voltage.
BPU offers a security lighting program. The security lighting is available to both residential and commercial customers. BPU maintains the security light. This service is offered for a monthly fee of $12.50 (+tax) per security light. A Security Light Agreement has to be signed before a light can be installed.
Security Lights Service Agreement
An off peak heating customer uses electricity as their primary source of heat. An off peak heating system utilizes a thermal (heat) storage system that heats up during off peak times, typically 11:00 p.m. to 7:00 a.m. In-floor electric mats, electric boilers for in floor hot water heat, and brick storage units are all examples of storage heat system. The heat is then released into your house the following day to provide 100% of your heating as needed.
An off peak water heating customer is required to have a 120 gallon or larger, UL approved, water heater installed. The water heater storage system heats water during off peak times, typically 11:00 p.m. to 7:00 a.m. The heated water can then be used anytime during the day.
Disconnect/Reconnect Electricity | |||
7:00 a.m. - 3:00 p.m. (dropping lines, meter maintenance, etc) | No Charge | ||
After hours Emergency Disconnect/Reconnect | No Charge | ||
Temporary Service-If line is extended additional fees could be incurred | $150.00 | ||
Disconnected delinquent accounts & Foreclosures - 7:00 a.m. - 3:00 p.m. | $50.00 | ||
Special Events | |||
Service Charge (Additional charges could be incurred) | $150.00 | ||
Electric commercial base service charge per meter | $25.00 | ||
Commercial kWh charge | $0.10581 | ||
Turn Off/On Water | |||
7:00 a.m - 3:00 p.m. | No Charge | ||
After hours Emergency Turn Off | No Charge | ||
Disconnected delinquent accounts & Foreclosures - 7:00 a.m. - 3:00 p.m. | $50.00 | ||
Tampering With Meter | |||
Tampering Fee | $350.00 | ||
Additional Reconnect Fee | $50.00 | ||
3 month average deposit | Varies | ||
New Water Service-1" (main to curb stop) RESTORATION IS OWNER'S RESPONSIBILITY | Total Costs Incurred | ||
Water Main Tap | |||
3/4" or 1" plus materials | $300.00 | ||
1 1/2" or 2" plus materials | $600.00 | ||
Water Transmitter | $140.00 | ||
Water Meters | |||
5/8" - 1/2" Iperl | $235.00 | ||
3/4" Iperl | $235.00 | ||
1" Iperl | $325.00 | ||
1 1/2" Omni-C2 | $1,935.00 | ||
2" Omni-C2 | $2,235.00 | ||
3" Omni-C2 | $2,820.00 | ||
4" Omni T2 | $4,910.00 | ||
Bulk Water Sales | |||
Service Charge | $19.30 | ||
Charge per 1,000 gallons | $4.10 | ||
Hydrant Meter Deposit - (Refundable) | $1,000.00 | ||
Pole Attachments - annually per pole | $7.00 | ||
Security Lights - monthly per light | $12.50 + sales tax | ||
No charge to install if installed on existing pole | |||
Oversize Loads | |||
Under $500 estimate | Full estimate before move | ||
Over $500 estimate | $500 + 50% of est. cost over $500 | ||
BPU Equipment and Employees | |||
Hourly Rate Per Employee | $70/hr | ||
After Hours Hourly Rate Per Employee | $105/hr | ||
Materials | Materials + 20% & sales tax | ||
Truck | $100/day | ||
Backhoe | $45/hr | ||
Generator | $950/day + fuel |